Shriram 107 SouthEast — 2 & 3 BHK near E-City, Attibele
Shriram 107 SouthEast
Overview Live Inventory Plans Amenities Location Gallery
Book a Site Visit
Shriram 107 SouthEast entrance
Phase 3 · Tower 1A now open for bookings

Adjust #NoMore

Smartly designed 2 & 3 BHK residences across 19 acres in Attibele — 15 minutes from E-City Phase 2, with 78% open space and 40+ amenities.

View live availability
19
Acres gated community
78%
Open & landscaped
40+
Lifestyle amenities
18k
Sq.ft. clubhouse
{{ availableCount }}
Units available · Tower 1A
Unbeatable Location Unbeatable Designs Unbeatable Lifestyle Unmissable Opportunity Unbeatable Location Unbeatable Designs Unbeatable Lifestyle Unmissable Opportunity
01 — The Address

A vibrant life,
packaged just right

Shriram 107 SouthEast sits off Hosur Road in Attibele — the corridor feeding Electronic City, Bommasandra and Sarjapur. Nine towers of 2B+14 floors, built on MIVAN technology for precision finishes and on-time delivery, wrapped in landscaped gardens and lakeside greens.

Zero-space-wastage layouts. No south-facing units. Maximum carpet area in every room.

Configuration
2 & 3 BHK
Sizes
698 – 914 sq.ft.
Structure
9 towers · 2B+14
Construction
MIVAN tech
Landscaped central green
Swimming pool at dusk
Living and dining
02 — Live Inventory

Tower 1A
availability

{{ totalCount }}
Total units
{{ availableCount }}
Available
{{ blockedCount }}
On hold
{{ soldCount }}
Sold
Updated {{ updatedAt }}
{{ card.name }}
{{ card.sba }} sq.ft.
{{ card.fromLabel }} Negotiable
{{ card.available }} / {{ card.total }} available
Available
On hold
Sold
Showing {{ filteredCount }} of {{ totalCount }} units · prices on request
{{ col }}
Ground floor at the bottom · click any unit for details
Unit
{{ sel.id }}
{{ sel.statusLabel }}
Type
{{ sel.type }}
Super built-up
{{ sel.sba }} sq.ft.
Floor
{{ sel.floorLabel }}
Band
{{ sel.band }} rise
All-inclusive price
{{ sel.priceLabel }}
Negotiable
Base price, car park, floor rise, club house, corpus and GST included. Registration and stamp duty extra.
Base price, car park, floor rise, club house, infra, corpus and GST shared on enquiry.
Pick a unit from the stack.

Every square in the grid is a real apartment in Tower 1A. Tap one to see its configuration, floor, size and current status — then ask us for the price.

Tower 1A · Floor plate
{{ plateFloorLabel }}
Unit positions follow the sanctioned Tower 1A unit-numbering cluster plan — north wing 7 & 8, east wing 1 & 2, south wing 3 & 4, west wing 5 & 6. Schematic, not to scale.
Unit
{{ sel.id }}
Type
{{ sel.type }} · {{ sel.sba }} sq.ft.
Price
{{ sel.priceLabel }}
Negotiable
{{ sel.statusLabel }}
Tap a unit above to see its details and request pricing.
Reference
Unit numbering cluster plan

Tower 1A is the top-right cluster (T-1A). Each tower repeats the same eight-unit cross plate from ground to the 14th floor.

Tower unit numbering cluster plan
Unit Floor Type SBA Band Price Status
{{ r.id }} {{ r.floorLabel }} {{ r.type }} {{ r.sba }} sq.ft. {{ r.band }} {{ r.priceLabel }}Negotiable {{ r.statusLabel }}
03 — Residences

Aweinspiring
designs

Six unit plans across two configurations. Every one designed for maximum carpet area, cross ventilation and a balcony with a view.

{{ planLabel }} unit plan
{{ planLabel }}
{{ planUnits }} · {{ planCount }} units in Tower 1A · Ground to 14th floor
RERA carpet
{{ planCarpet }}
Balcony
{{ planBalcony }}
Saleable
{{ planSba }}
{{ r.k }}{{ r.v }}
Check availability
04 — Master Plan

19 acres.
78% open.

Nine towers set back from the greens, an 18,000 sq.ft. clubhouse at the heart, sports courts to the edges and a lakeside walk. Tower 1A sits in Phase 3.

Central 18,000 sq.ft. clubhouse
Landscaped gardens & lakeside walk
Cricket pitch, football, volleyball, basketball
Sewage treatment, OWC, rainwater harvesting
Shriram 107 SouthEast overall master plan
05 — Amenities

Forty plus
reasons to stay in

Party is extra fun when you don't need to travel for it.
{{ g.title }}
{{ it }}
06 — Location

Off Hosur Road,
into everything

Manchanahalli Road, Krishnasagara, Attibele — NH-44 on one side, the Electronic City tech belt fifteen minutes up the road.

Drive times
{{ d.name }} {{ d.time }}
Indicative, off-peak.
What's coming
Peripheral Ring Road & STRR corridors
Proposed Metro Neo connectivity
Metro link to Bommasandra & Jigani
Alliance University, PES, IFIM, DPS nearby
Narayana Hrudayalaya, Oxford Medical, Vimalaya
08 — Specifications

Built to last, finished to please

{{ s.title }}
{{ it }}
Interior
09 — Visit

See it before
you decide

Share your details and our team will send the Tower 1A price sheet, confirm live availability and arrange a site visit at a time that suits you.

Sales desk
+91 78923 95798
Site: Manchanahalli Rd, Krishnasagara, Attibele, Bengaluru 562107
Enquiry received

Thank you. Our sales team will call you on the number you shared, usually within a couple of hours.

Request price sheet & site visit
{{ formError }}
By submitting you consent to be contacted about this project. Prices and availability are indicative and subject to change.
10 — FAQ

Good
questions

{{ f.a }}

Shriram 107 SouthEast

Smartly designed 2 & 3 BHK residences, 15 minutes from E-City Phase 2. A Shriram Properties development in joint venture with Garden City Realty.

Explore
Contact
+91 78923 95798 Manchanahalli Rd, Krishnasagara,
Attibele, Bengaluru 562107
Book a site visit →
RERA
Phase 3 — Shriram 107 SouthEast
PRM/KA/RERA/1251/308/PR/140222/004708
Phase 1 OC received — …/181122/002156
Phase 2 OC received — …/190715/002689
rera.karnataka.gov.in
Images, renders and walkthroughs shown are artistic impressions for representational purposes only and may vary from the actual product delivered. Master plan, unit plans, specifications, amenities, layouts and unit numbering are indicative and subject to change or relocation by the developer or competent authority without prior notice, as may be required during construction. Carpet, built-up and super built-up areas mentioned are approximate and subject to RERA-compliant measurement at handover. All prices, charges, floor-rise, PLC and other costs shown are indicative, subject to revision, confirmation and availability at the time of booking; GST, stamp duty, registration and other statutory charges are payable extra as applicable. This webpage is for information only, does not constitute an offer, invitation or contract of any kind, and is not a substitute for the Agreement for Sale or RERA-registered project documents. Shriram 107 SouthEast — Phase 3 is registered under RERA No. PRM/KA/RERA/1251/308/PR/140222/004708 (verify at rera.karnataka.gov.in); Phases 1 and 2 have received Occupancy Certificates. Project financed by State Bank of India. Prospective buyers are advised to independently verify all project details, approvals and RERA registration before making any booking or payment decision. Terms and conditions apply.
{{ lightboxAlt }}
{{ lightboxAlt }} · click to close
Shriram 107 SouthEast
Inventory & Leads Console
Sign in

Enter your sales-team login to manage unit status and view enquiries.

{{ adminError }}
{{ selectionLabel }}
Unit Floor Type SBA Price Status
{{ a.id }} {{ a.floorLabel }} {{ a.type }} {{ a.sba }} {{ a.priceLabel }}
Click a unit to select it, or a floor label to select the whole floor — then apply a status from the bar above.
When Name Mobile Interest Message
{{ l.when }} {{ l.name }} {{ l.phone }} {{ l.interest }} {{ l.message }}
No enquiries yet.

Submissions from the site-visit form will appear here.

{{ toast }}